{"source":"CAD Trust observer API, Gold Standard public API, Verra registry snapshot (4 Jun 2026)","lastUpdated":"2026-11-21T17:35:28.880Z","count":81,"data":[{"id":12,"name":"Lao Promoting REDD Plus through Governance, Forest Landscapes and Livelihood in Northern Lao PDR","registry":"Carbon Assets Tracking System (CATS)","registryProjectId":"P165751","program":"Lao Promoting REDD Plus through Governance, Forest Landscapes and Livelihood in Northern Lao PDR","developer":"Ministry of Agriculture and Forestry","status":"Registered","statusDate":"2019-01-01","sector":"Agriculture; forestry and fishing","projectType":"REDD+: Reduced Emissions from Deforestation and Degradation","methodology":"CATS - FCPF","validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":null,"creditsIssued":4435451,"creditsRetired":0,"verificationPeriods":1,"lastVerification":"2021-12-31","projectLink":"https://cats.worldbank.org/","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":29,"name":"Energy Efficiency Improvement Project At A Beer Brewery In Lao PDR","registry":"CDM Registry","registryProjectId":"42AOB3MD9XQS3VS4YEZUEU5JUXQQ27","program":"PA","developer":"Proact International, E&E Solutions","status":"Registered","statusDate":"2023-12-10","sector":"NA","projectType":"EE Industry","methodology":"CDM - AMS-I.C.; AMS-II.D.","validationBody":"Det Norske Veritas- CUK","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2007-04-07","end":"2017-04-06"},"creditsIssued":2168,"creditsRetired":0,"verificationPeriods":1,"lastVerification":"2008-03-31","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/42AOB3MD9XQS3VS4YEZUEU5JUXQQ27/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":26,"name":"Mitigation of GHG: Rubber based agro-forestry system for sustainable development and poverty reduction in Pakkading, Bolikhamsay Province, Lao PDR.","registry":"CDM Registry","registryProjectId":"VG9OE34YH3VA3E2HZG1BEO24VAR2NI","program":"PA","developer":"n.a.","status":"Registered","statusDate":"2023-12-10","sector":"Afforestation and reforestation","projectType":"Reforestation","methodology":"CDM - AR-ACM0003","validationBody":"TÜV SÜD South Asia Private Limited (TÜV SÜD)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2015-06-18","end":"2045-06-17"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/VG9OE34YH3VA3E2HZG1BEO24VAR2NI/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":94,"name":"Nam Hinboun Hydropower Project","registry":"CDM Registry","registryProjectId":"PGZ12IT5RE9U1B0Q8H2VAN6R8END6I","program":"PA","developer":"Beijing Karbon Energy Investment and Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"Shenzhen CTI International Certification Co., Ltd (CTI)    ","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2017-06-01","end":"2024-05-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/PGZ12IT5RE9U1B0Q8H2VAN6R8END6I/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":90,"name":"Nam Kap Hydropower Project","registry":"CDM Registry","registryProjectId":"I7LPT5IWU9O2DB173DBIVS7ILEM2SB","program":"PA","developer":"Swiss Carbon Asset","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"CCCI_DOE","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2020-01-01","end":"2026-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/I7LPT5IWU9O2DB173DBIVS7ILEM2SB/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":100,"name":"Nam Lik 1 Hydropower Project","registry":"CDM Registry","registryProjectId":"A7X1KQW7IXNXW0GN5JANQU0416IOVL","program":"PA","developer":"Asianet Services","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"Det Norske Veritas- CUK","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2016-01-01","end":"2022-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/A7X1KQW7IXNXW0GN5JANQU0416IOVL/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":105,"name":"Nam Lik 1-2 Hydropower Project","registry":"CDM Registry","registryProjectId":"3TBPNROEG9CQXBHKKD4RGC0FISS2ZX","program":"PA","developer":"Arcticwind Technology Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"Germanischer Lloyd Certification GmbH","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2012-05-04","end":"2019-05-03"},"creditsIssued":501072,"creditsRetired":0,"verificationPeriods":3,"lastVerification":"2014-02-28","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/3TBPNROEG9CQXBHKKD4RGC0FISS2ZX/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":101,"name":"Nam Long Hydropower project","registry":"CDM Registry","registryProjectId":"5UFUWBGMKZMWLN09X8U2GIXRGWVAPV","program":"PA","developer":"n.a.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"JACO CDM CO., LTD","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2014-10-01","end":"2021-09-30"},"creditsIssued":106397,"creditsRetired":0,"verificationPeriods":2,"lastVerification":"2019-10-31","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/5UFUWBGMKZMWLN09X8U2GIXRGWVAPV/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":92,"name":"Nam Mang 1 Hydropower Project","registry":"CDM Registry","registryProjectId":"Q4GB9SG4PPWR8FAN7W8UFTAIK0JFMG","program":"PA","developer":"Nam Mang 1 Power Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"Shenzhen CTI International Certification Co., Ltd (CTI)    ","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2017-10-01","end":"2024-09-30"},"creditsIssued":389296,"creditsRetired":0,"verificationPeriods":2,"lastVerification":"2020-12-31","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/Q4GB9SG4PPWR8FAN7W8UFTAIK0JFMG/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":97,"name":"Nam Nga 2 Hydropower Project","registry":"CDM Registry","registryProjectId":"2R59LE9XODG075O4SA56EAJW485VYS","program":"PA","developer":"n.a.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"TÜV Rheinland (China) Ltd. (TÜV Rheinland)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2016-05-11","end":"2023-05-10"},"creditsIssued":108139,"creditsRetired":0,"verificationPeriods":1,"lastVerification":"2019-09-25","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/2R59LE9XODG075O4SA56EAJW485VYS/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":91,"name":"Nam Ngao Hydropower Project","registry":"CDM Registry","registryProjectId":"OOEOTPFZW8MH1WKTGW8OJ3ME7TP36Z","program":"PA","developer":"Beijing Karbon Energy Investment and Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"Shenzhen CTI International Certification Co., Ltd (CTI)    ","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2018-01-01","end":"2024-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/OOEOTPFZW8MH1WKTGW8OJ3ME7TP36Z/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":103,"name":"Nam Ngiep 3A Hydropower Project","registry":"CDM Registry","registryProjectId":"LWW53E2DOQ2N2RRN87UQNTJ5RZGAP2","program":"PA","developer":"n.a.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"JACO CDM CO., LTD","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2014-01-30","end":"2021-01-29"},"creditsIssued":262755,"creditsRetired":0,"verificationPeriods":2,"lastVerification":"2017-02-28","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/LWW53E2DOQ2N2RRN87UQNTJ5RZGAP2/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":95,"name":"Nam Ngiep II Hydropower Project","registry":"CDM Registry","registryProjectId":"C4FY8DPBU0ECEW1SZRG2YW7LPTT311","program":"PA","developer":"Beijing Karbon Energy Investment and Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"Shenzhen CTI International Certification Co., Ltd (CTI)    ","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2017-03-01","end":"2024-02-29"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/C4FY8DPBU0ECEW1SZRG2YW7LPTT311/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":104,"name":"Nam Ngum 5 Hydropower Project","registry":"CDM Registry","registryProjectId":"YW88YY4BASEAIYD3XKIF7VDSC7WRW5","program":"PA","developer":"Beijing Haohua Rivers International Water Engineering Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"China Environmental United Certification Center Co., Ltd. (CEC)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2013-01-01","end":"2019-12-31"},"creditsIssued":1622822,"creditsRetired":0,"verificationPeriods":3,"lastVerification":"2020-12-31","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/YW88YY4BASEAIYD3XKIF7VDSC7WRW5/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":96,"name":"Nam Pha Gnai Hydropower Project","registry":"CDM Registry","registryProjectId":"B343AV3L67ROEV5SEAIEKRUFNSJCDW","program":"PA","developer":"Beijing Karbon Energy Investment and Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"TÜV Rheinland (China) Ltd. (TÜV Rheinland)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2019-09-01","end":"2026-08-31"},"creditsIssued":104038,"creditsRetired":0,"verificationPeriods":1,"lastVerification":"2020-12-31","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/B343AV3L67ROEV5SEAIEKRUFNSJCDW/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":98,"name":"Nam Samoy Hydropower Project","registry":"CDM Registry","registryProjectId":"Y73HYSLOG1KXHPQOUVB8CP33VY9K73","program":"PA","developer":"Beijing Karbon Energy Investment and Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"TÜV Rheinland (China) Ltd. (TÜV Rheinland)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2015-09-01","end":"2022-08-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/Y73HYSLOG1KXHPQOUVB8CP33VY9K73/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":99,"name":"Nam Sana Hydropower Project","registry":"CDM Registry","registryProjectId":"A0DW9MCVAID7IP64NX8B2V2R0OGXW3","program":"PA","developer":"n.a.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"Det Norske Veritas- CUK","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2015-01-01","end":"2021-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/A0DW9MCVAID7IP64NX8B2V2R0OGXW3/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":27,"name":"Nam Sim Hydropower Project, Huapanh Province, Lao PDR","registry":"CDM Registry","registryProjectId":"P3D85V0GHIKF6264VRTJZXE1PD78HA","program":"PA","developer":"Asianet Services","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"TÜV Rheinland (China) Ltd. (TÜV Rheinland)","province":"Houaphanh","latitude":"20.420000","longitude":"104.040000","annualEstimate":null,"creditingPeriod":{"start":"2015-01-19","end":"2022-01-18"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/P3D85V0GHIKF6264VRTJZXE1PD78HA/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":93,"name":"Nam Sor Hydropower Project","registry":"CDM Registry","registryProjectId":"ZTZJ9ISZPR4Y5F762O45C1W7IWNXBW","program":"PA","developer":"Beijing Karbon Energy Investment and Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"Shenzhen CTI International Certification Co., Ltd (CTI)    ","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2018-01-01","end":"2024-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/ZTZJ9ISZPR4Y5F762O45C1W7IWNXBW/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":112,"name":"TBEC LIG Biogas Project","registry":"CDM Registry","registryProjectId":"IMUZV2SO1NP862AAYIS7QEW4LFMGLV","program":"PA","developer":"Carbon Bridge","status":"Registered","statusDate":"2023-12-10","sector":"Waste handling and disposal","projectType":"Methane avoidance","methodology":"CDM - ACM0014","validationBody":"SIRIM QAS INTERNATIONAL SDN.BHD (SIRIM)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2012-11-16","end":"2019-11-15"},"creditsIssued":16392,"creditsRetired":0,"verificationPeriods":3,"lastVerification":"2013-12-31","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/IMUZV2SO1NP862AAYIS7QEW4LFMGLV/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":102,"name":"Xe Namnoy 2 - Xe Katam 1 Hydropower Project","registry":"CDM Registry","registryProjectId":"L5RM2SA02DR90EPCE6DDWVSYNH3YKF","program":"PA","developer":"n.a.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"JACO CDM CO., LTD","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2015-01-01","end":"2021-12-31"},"creditsIssued":197837,"creditsRetired":0,"verificationPeriods":3,"lastVerification":"2019-10-25","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/L5RM2SA02DR90EPCE6DDWVSYNH3YKF/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":28,"name":"Xekaman 3 Hydropower Project, Lao PDR","registry":"CDM Registry","registryProjectId":"9I39QY6TYK8FXC74YBDDSH8I7N5A3H","program":"PA","developer":"Ecotawa","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"Swiss Association for Quality and Management Systems","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2013-04-30","end":"2020-04-29"},"creditsIssued":828779,"creditsRetired":0,"verificationPeriods":1,"lastVerification":"2016-05-31","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/9I39QY6TYK8FXC74YBDDSH8I7N5A3H/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":108,"name":"Xenamnoy 1 Hydropower Project","registry":"CDM Registry","registryProjectId":"F0E8PMGQBWUDX724JB84JPNJQ4APT7","program":"PA","developer":"n.a.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"JACO CDM CO., LTD","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2014-03-01","end":"2021-02-28"},"creditsIssued":255277,"creditsRetired":0,"verificationPeriods":3,"lastVerification":"2019-09-30","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/F0E8PMGQBWUDX724JB84JPNJQ4APT7/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":107,"name":"Xenamnoy-6 Hydropower project","registry":"CDM Registry","registryProjectId":"8QOIKDO2QH43O4J4E8BLZNM38IBF22","program":"PA","developer":"Beijing Karbon Energy Investment and Consulting Co.","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - AMS-I.D.","validationBody":"TÜV Rheinland (China) Ltd. (TÜV Rheinland)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2015-07-28","end":"2022-07-27"},"creditsIssued":60306,"creditsRetired":0,"verificationPeriods":2,"lastVerification":"2019-09-30","projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/8QOIKDO2QH43O4J4E8BLZNM38IBF22/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":85,"name":"Xeset II Hydropower Project","registry":"CDM Registry","registryProjectId":"RJJU1CSPJ032850GSW2X91O2EFSSZL","program":"PA","developer":"Earth System Lao","status":"Registered","statusDate":"2023-12-10","sector":"Energy industries (renewable - / non-renewable sources)","projectType":"Hydro","methodology":"CDM - ACM0002","validationBody":"Bureau Veritas Certification Holding SAS (BVCH)","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":{"start":"2012-05-30","end":"2019-05-29"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://cdm.unfccc.int/Projects/Validation/DB/RJJU1CSPJ032850GSW2X91O2EFSSZL/view.html","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":111,"name":"15MW Lower Houay Lamphan Hydropower Project","registry":"Cercarbono","registryProjectId":"167","program":null,"developer":"Kosher Climate India Private Limited","status":"Registered","statusDate":"2024-07-28","sector":"Electricity; gas, steam and air conditioning supply","projectType":"Avoided Conversion","methodology":"CDM - AMS-I.D.: Grid connected renewable electricity generation","validationBody":"4K Earth Science Private Limited","province":"Sekong","latitude":"15.335177","longitude":"106.599733","annualEstimate":null,"creditingPeriod":null,"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://www.ecoregistry.io/projects/167","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":88,"name":"Nam Ngiep 2C Hydropower Project","registry":"Cercarbono","registryProjectId":"164","program":null,"developer":"Kosher Climate India Private Limited","status":"Registered","statusDate":"2024-07-28","sector":"Electricity; gas, steam and air conditioning supply","projectType":"Avoided Conversion","methodology":"CDM - AMS-I.D.: Grid connected renewable electricity generation","validationBody":"4K Earth Science Private Limited","province":null,"latitude":"19.456933","longitude":"103.180413","annualEstimate":null,"creditingPeriod":null,"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://www.ecoregistry.io/projects/164","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":87,"name":"Nam The Hydropower Project","registry":"Cercarbono","registryProjectId":"177","program":null,"developer":"Kosher Climate India Private Limited","status":"Registered","statusDate":"2024-07-28","sector":"Electricity; gas, steam and air conditioning supply","projectType":"Avoided Conversion","methodology":"CDM - AMS-I.D.: Grid connected renewable electricity generation","validationBody":"4K Earth Science Private Limited","province":null,"latitude":"19.601992","longitude":"103.570927","annualEstimate":null,"creditingPeriod":null,"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://www.ecoregistry.io/projects/177","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":65,"name":"Development of Forest Carbon Project in Lao PDR PoA","registry":"Gold Standard","registryProjectId":"GS13170","program":"Gold Standard for the Global Goals","developer":"Chaleun Sekong Carbon Company Limited","status":"Listed","statusDate":"2025-11-06","sector":"A/R","projectType":"A/R · Large Scale","methodology":null,"validationBody":null,"province":"Sekong","latitude":"15.350000","longitude":"106.720000","annualEstimate":64690,"creditingPeriod":{"start":"2024-06-22","end":"2069-06-22"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/4976","nationalRegistration":null,"source":"Gold Standard registry","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":62,"name":"GS12929 VPA 01 Improved agricultural practices for rice cultivation in Laos.","registry":"Gold Standard","registryProjectId":"GS12930","program":"Gold Standard for the Global Goals","developer":"Kosher Climate India Pvt Ltd.","status":"Listed","statusDate":"2025-11-04","sector":"Other","projectType":"Other · Small Scale","methodology":null,"validationBody":null,"province":"Savannakhet","latitude":"16.560000","longitude":"104.750000","annualEstimate":52258,"creditingPeriod":{"start":"2024-05-15","end":"2030-05-15"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/5058","nationalRegistration":null,"source":"Gold Standard registry","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":64,"name":"GS13170 VPA - 01 Reforestation Project in Champasak","registry":"Gold Standard","registryProjectId":"GS13171","program":"Gold Standard for the Global Goals","developer":"Chaleun Sekong Carbon Company Limited","status":"Listed","statusDate":"2025-11-20","sector":"A/R","projectType":"A/R · Large Scale","methodology":null,"validationBody":null,"province":"Sekong","latitude":"15.350000","longitude":"106.720000","annualEstimate":64690,"creditingPeriod":{"start":"2024-06-22","end":"2069-06-22"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/4977","nationalRegistration":null,"source":"Gold Standard registry","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":81,"name":"Houay Lai Hydropower project","registry":"Gold Standard","registryProjectId":"GS2511","program":"2.2","developer":"Swiss Carbon Value Ltd.","status":"Certified design","statusDate":"2020-05-07","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":"Salavan","latitude":"15.720000","longitude":"106.420000","annualEstimate":8616,"creditingPeriod":{"start":"2015-03-01","end":"2022-03-01"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/397","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":80,"name":"Houay Saloung Hydropower project","registry":"Gold Standard","registryProjectId":"GS2512","program":"2.2","developer":"Swiss Carbon Value Ltd.","status":"Certified design","statusDate":"2020-05-07","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":4733,"creditingPeriod":{"start":"2015-03-01","end":"2022-03-01"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/398","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":67,"name":"Household water purifier project in Laos","registry":"Gold Standard","registryProjectId":"GS12111","program":"Gold Standard for the Global Goals","developer":"Lift Solution Limited","status":"Certified project","statusDate":"2025-11-30","sector":"Energy Efficiency - Domestic","projectType":"Energy Efficiency - Domestic · Large Scale","methodology":"GS Methodology for emission reductions from safe drinking water supply","validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":138871,"creditingPeriod":{"start":"2022-12-04","end":"2027-12-03"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/4071","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":63,"name":"Improved Agricultural Practices for Rice cultivation in Lao PDR","registry":"Gold Standard","registryProjectId":"GS12929","program":"Gold Standard for the Global Goals","developer":"Kosher Climate India Pvt Ltd.","status":"Listed","statusDate":"2025-11-04","sector":"Other","projectType":"Other · Small Scale","methodology":null,"validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":52258,"creditingPeriod":{"start":"2024-05-15","end":"2044-05-15"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/5057","nationalRegistration":null,"source":"Gold Standard registry","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":72,"name":"Improved Cookstove Program in Lao PDR","registry":"Gold Standard","registryProjectId":"GS4233","program":"Gold Standard for the Global Goals","developer":"ASSOCIATION FOR RURAL MOBILISATION AND IMPROVEMENT (ARMI)","status":"Certified project","statusDate":"2026-11-18","sector":"Energy Efficiency - Domestic","projectType":"Energy Efficiency - Domestic · Large Scale","methodology":"GS - REDUCED EMISSIONS FROM COOKING AND HEATING – TECHNOLOGIES AND PRACTICES TO DISPLACE DECENTRALIZED THERMAL ENERGY CONSUMPTION (TPDDTEC)","validationBody":null,"province":null,"latitude":"19.850000","longitude":"102.490000","annualEstimate":48521,"creditingPeriod":{"start":"2014-02-01","end":"2028-01-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/717","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":66,"name":"Laos Green Benefit Cookstove Project","registry":"Gold Standard","registryProjectId":"GS12796","program":"Gold Standard for the Global Goals","developer":"Guangzhou Iceberg Environmental Consulting Services Co., Ltd.","status":"Listed","statusDate":"2026-09-14","sector":"Energy Efficiency - Domestic","projectType":"Energy Efficiency - Domestic · Large Scale","methodology":null,"validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":100000,"creditingPeriod":{"start":"2024-07-01","end":"2029-06-30"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/4847","nationalRegistration":null,"source":"Gold Standard registry","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":70,"name":"Nam Hinboun Downstream Hydro power Project","registry":"Gold Standard","registryProjectId":"GS6018","program":"2.2","developer":"Swiss Carbon Assets Ltd.","status":"Listed","statusDate":"2020-05-07","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":null,"latitude":"17.433800","longitude":"104.391900","annualEstimate":30000,"creditingPeriod":{"start":"2017-09-12","end":"2022-09-12"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/1050","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":71,"name":"Nam Kap Hydropower Project","registry":"Gold Standard","registryProjectId":"GS5832","program":"2.2","developer":"Swiss Carbon Assets Ltd.","status":"Listed","statusDate":"2020-05-07","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":null,"latitude":"19.190000","longitude":"102.554300","annualEstimate":20000,"creditingPeriod":{"start":"2017-04-27","end":"2027-04-26"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/1023","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":78,"name":"Nam Long Hydropower Project","registry":"Gold Standard","registryProjectId":"GS2707","program":"Gold Standard for the Global Goals","developer":"Climate Bridge (Shanghai) Ltd.","status":"Certified project","statusDate":"2025-12-22","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":"Luang Namtha","latitude":"20.970000","longitude":"101.411000","annualEstimate":20864,"creditingPeriod":{"start":"2014-10-01","end":"2026-09-30"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/481","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":68,"name":"Nam Long Hydropower Project (GS2707 CER to VER conversion)","registry":"Gold Standard","registryProjectId":"GS10355","program":"Gold Standard for the Global Goals","developer":"Climate Bridge (Shanghai) Ltd.","status":"Certified project","statusDate":"2020-10-21","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"GS - OTHER","validationBody":null,"province":"Luang Namtha","latitude":"20.950000","longitude":"101.400000","annualEstimate":24035,"creditingPeriod":{"start":"2014-11-01","end":"2021-10-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/2118","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":76,"name":"Nam Nga 2 Hydropower Project","registry":"Gold Standard","registryProjectId":"GS3372","program":"Gold Standard for the Global Goals","developer":"Swiss Carbon Assets Ltd.","status":"Certified design","statusDate":"2025-05-09","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":35019,"creditingPeriod":{"start":"2016-01-01","end":"2023-01-01"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/568","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":73,"name":"Nam Ngao Hydropower Project","registry":"Gold Standard","registryProjectId":"GS4208","program":"2.2","developer":"Swiss Carbon Assets Ltd.","status":"Certified design","statusDate":"2020-05-07","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":"Bokeo","latitude":"20.290000","longitude":"100.420000","annualEstimate":49292,"creditingPeriod":{"start":"2018-01-01","end":"2025-01-01"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/714","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":75,"name":"Nam Pha Gnai Hydropower Project","registry":"Gold Standard","registryProjectId":"GS3514","program":"Gold Standard for the Global Goals","developer":"Swiss Carbon Assets Ltd.","status":"Certified project","statusDate":"2026-10-27","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Large Scale","methodology":"CDM - ACM0002","validationBody":null,"province":"Vientiane Province","latitude":"18.594500","longitude":"102.511800","annualEstimate":72735,"creditingPeriod":{"start":"2019-09-01","end":"2026-08-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/611","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":79,"name":"Nam Samoy Hydropower Project","registry":"Gold Standard","registryProjectId":"GS2695","program":"2.2","developer":"Swiss Carbon Value Ltd.","status":"Certified design","statusDate":"2020-05-07","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":"Vientiane Province","latitude":"19.911000","longitude":"102.302500","annualEstimate":15666,"creditingPeriod":{"start":"2015-09-01","end":"2022-09-01"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/477","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":74,"name":"Nam Sor Hydropower Project","registry":"Gold Standard","registryProjectId":"GS4207","program":"2.2","developer":"Swiss Carbon Assets Ltd.","status":"Certified design","statusDate":"2020-05-07","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":"Vientiane Province","latitude":"18.600000","longitude":"102.450000","annualEstimate":10630,"creditingPeriod":{"start":"2018-01-01","end":"2025-01-01"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/713","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":69,"name":"TBEC LIG Biogas Project","registry":"Gold Standard","registryProjectId":"GS876","program":"2.1","developer":"Carbon Bridge Pte Ltd","status":"Listed","statusDate":"2020-05-07","sector":"Biogas - Heat","projectType":"Biogas - Heat · Large Scale","methodology":"ACM0014 Treatment of wastewater","validationBody":null,"province":"Vientiane Province","latitude":"18.078030","longitude":"102.972122","annualEstimate":37120,"creditingPeriod":{"start":"2012-01-01","end":"2022-08-01"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/1241","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":84,"name":"TerraClear Ceramic Water Purifier Project in Lao PDR","registry":"Gold Standard","registryProjectId":"GS2095","program":"Gold Standard for the Global Goals","developer":"TerraClear Production Co. Ltd.","status":"Certified project","statusDate":"2026-01-05","sector":"Energy Efficiency - Domestic","projectType":"Energy Efficiency - Domestic · Small Scale","methodology":"GS - REDUCED EMISSIONS FROM COOKING AND HEATING – TECHNOLOGIES AND PRACTICES TO DISPLACE DECENTRALIZED THERMAL ENERGY CONSUMPTION (TPDDTEC)","validationBody":null,"province":null,"latitude":"17.416667","longitude":"104.843794","annualEstimate":33541,"creditingPeriod":{"start":"2012-07-16","end":"2026-07-15"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/323","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":61,"name":"TerraClear Safe Drinking Water in Laos 💦","registry":"Gold Standard","registryProjectId":"GS23624","program":"Gold Standard for the Global Goals","developer":"TerraClear Production Co. Ltd.","status":"Listed","statusDate":"2026-10-12","sector":"Energy Efficiency - Domestic","projectType":"Energy Efficiency - Domestic · Small Scale","methodology":null,"validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":60000,"creditingPeriod":{"start":"2025-09-01","end":"2030-08-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/5575","nationalRegistration":null,"source":"Gold Standard registry","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":82,"name":"Xe Namnoy 2 - Xe Katam 1 Hydropower project","registry":"Gold Standard","registryProjectId":"GS2510","program":"v2.2 CASH","developer":"Swiss Carbon Assets Ltd.","status":"Certified project","statusDate":"2023-05-18","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":46438,"creditingPeriod":{"start":"2022-01-01","end":"2028-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/396","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":77,"name":"Xenamnoy 1 Hydropower Project","registry":"Gold Standard","registryProjectId":"GS2766","program":"Gold Standard for the Global Goals","developer":"Swiss Carbon Assets Ltd.","status":"Certified project","statusDate":"2025-12-22","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":null,"latitude":"15.911000","longitude":"106.438000","annualEstimate":47558,"creditingPeriod":{"start":"2014-03-01","end":"2028-02-29"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/498","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":83,"name":"Xenamnoy 6 Hydropower Project","registry":"Gold Standard","registryProjectId":"GS2490","program":"Gold Standard for the Global Goals","developer":"South Pole Ltd SCV","status":"Certified project","statusDate":"2025-12-10","sector":"Small, Low - Impact Hydro","projectType":"Small, Low - Impact Hydro · Small Scale","methodology":"AMS-I.D. Grid connected renewable electricity generation","validationBody":null,"province":"Sekong","latitude":"15.821000","longitude":"106.384200","annualEstimate":15107,"creditingPeriod":{"start":"2015-07-28","end":"2029-07-27"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.goldstandard.org/projects/details/385","nationalRegistration":null,"source":"Gold Standard registry + CAD Trust","retrievedAt":"2026-11-21T17:35:28.779Z"},{"id":59,"name":"10.2MW Nam Yeim Hydro Power Project","registry":"Verra","registryProjectId":"5851","program":"Verified Carbon Standard · VCS Version 3","developer":"SINGAPORE TREASURE CARBON TECH PTE. LTD.","status":"Under development","statusDate":"2025-12-18","sector":"Energy industries (renewable/non-renewable sources)","projectType":null,"methodology":"AMS-I.D.","validationBody":null,"province":null,"latitude":"19.035944","longitude":"103.985888","annualEstimate":22841,"creditingPeriod":{"start":"2026-03-01","end":"2036-02-29"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5851","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":35,"name":"15 MW Nam Hinboun Downstream Hydropower Project","registry":"Verra","registryProjectId":"3662","program":"VCS","developer":"Rasita Power Co. Ltd.","status":"Registered","statusDate":"2023-04-11","sector":"Energy Industries (renewable/non-renewable sources)","projectType":"Energy Industries (renewable/non-renewable sources)","methodology":"AMS-I.D.","validationBody":null,"province":"Khammouane","latitude":"17.400000","longitude":"104.800000","annualEstimate":null,"creditingPeriod":null,"creditsIssued":11473,"creditsRetired":9189,"verificationPeriods":2,"lastVerification":"2022-07-31","projectLink":"https://registry.verra.org/app/projectDetail/VCS/3662","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":89,"name":"15 MW Nam The Hydropower Project","registry":"Verra","registryProjectId":"3986","program":"VCS","developer":"Kosher Climate India Pvt. Ltd.","status":"Listed","statusDate":"2024-07-17","sector":"Energy Industries (renewable/non-renewable sources)","projectType":"Energy Demand","methodology":"VCS-AMS-I.D.","validationBody":null,"province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":null,"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/3986","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":50,"name":"600 MW Monsoon Wind Power Project","registry":"Verra","registryProjectId":"5452","program":"Verified Carbon Standard · VCS Version 3","developer":"Monsoon Wind Power Company Limited","status":"Under validation","statusDate":"2025-02-18","sector":"Energy industries (renewable/non-renewable sources)","projectType":null,"methodology":"ACM0002","validationBody":null,"province":null,"latitude":"15.388442","longitude":"107.237575","annualEstimate":1347847,"creditingPeriod":{"start":"2025-03-31","end":"2032-03-30"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5452","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":32,"name":"Afforestation in Eucalyptus and Acacia plantations for Burapha Agroforestry Co., Ltd.","registry":"Verra","registryProjectId":"2367","program":"VCS","developer":"Burapha Agroforestry Co. Ltd","status":"Registered","statusDate":"2025-04-27","sector":"Agriculture; forestry and fishing","projectType":"Agriculture Forestry and Other Land Use","methodology":"AR-ACM0003","validationBody":"TÜV NORD CERT GmbH","province":"Xaisomboun","latitude":"18.890000","longitude":"102.950000","annualEstimate":44946,"creditingPeriod":{"start":"2016-05-31","end":"2036-05-30"},"creditsIssued":99117,"creditsRetired":54894,"verificationPeriods":7,"lastVerification":"2022-12-31","projectLink":"https://registry.verra.org/app/projectDetail/VCS/2367","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":60,"name":"Distribution and Installation of New Energy-Efficient Cookstoves (ICS) in Laos","registry":"Verra","registryProjectId":"5855","program":"Verified Carbon Standard · VCS Version 3","developer":"Bridge Carbon SGT Asia Stoves Private Limited","status":"Under development","statusDate":"2025-12-19","sector":"Energy demand","projectType":null,"methodology":"VM0050","validationBody":null,"province":null,"latitude":"19.856278","longitude":"102.503611","annualEstimate":106828,"creditingPeriod":{"start":"2026-01-01","end":"2035-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5855","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":4,"name":"Global Safe Drinking Water for Schools in Lao","registry":"Verra","registryProjectId":"5121","program":"VCS","developer":"Sustainability Investment Promotion and Development Joint Stock Company","status":"Listed","statusDate":"2001-01-01","sector":"Energy Demand","projectType":"Energy Demand","methodology":"VCS-AMS-I.E.; VCS-AMS-III.AV.","validationBody":"EcoLance Private Limited","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":null,"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5121","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":6,"name":"Grouped Projects for Laos Improved Cookstove","registry":"Verra","registryProjectId":"2924","program":"VCS","developer":"Sustainability Investment Promotion and Development Joint Stock Company","status":"Registered","statusDate":"2026-02-04","sector":"Energy Demand","projectType":"Energy Demand","methodology":"VMR0006","validationBody":"Carbon Check (India) Private Ltd.","province":null,"latitude":"20.415900","longitude":"104.100100","annualEstimate":300000,"creditingPeriod":{"start":"2023-03-10","end":"2033-03-09"},"creditsIssued":0,"creditsRetired":0,"verificationPeriods":10,"lastVerification":"2024-12-31","projectLink":"https://registry.verra.org/app/projectDetail/VCS/2924","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":7,"name":"Grouped Projects For Laos Water Purifier","registry":"Verra","registryProjectId":"3204","program":"VCS","developer":"Sustainability Investment Promotion and Development Joint Stock Company","status":"Listed","statusDate":"2025-12-23","sector":"Energy Demand","projectType":"Energy Demand","methodology":"AMS-III.AV.","validationBody":"EcoLance Private Limited","province":null,"latitude":"13.916600","longitude":"100.133300","annualEstimate":65928,"creditingPeriod":{"start":"2023-07-25","end":"2033-07-24"},"creditsIssued":23867,"creditsRetired":0,"verificationPeriods":6,"lastVerification":"2025-06-30","projectLink":"https://registry.verra.org/app/projectDetail/VCS/3204","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":30,"name":"Household Appliance Distribution in Lao PDR-CPA-003","registry":"Verra","registryProjectId":"4127","program":"VCS","developer":"C-Quest Capital Stoves Asia Limited","status":"Listed","statusDate":"2023-06-25","sector":"Energy Demand","projectType":"Energy Demand","methodology":"VMR0006","validationBody":"Carbon Check (India) Private Ltd.","province":null,"latitude":"19.856276","longitude":"102.495500","annualEstimate":201394,"creditingPeriod":{"start":"2018-10-23","end":"2028-10-22"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/4127","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":9,"name":"Installation of high efficiency wood burning cookstoves in Laos","registry":"Verra","registryProjectId":"2521","program":"VCS","developer":"C-Quest Capital SGT Asia Stoves Private Limited","status":"Listed","statusDate":"2025-12-10","sector":"Energy Industries (renewable/non-renewable sources)","projectType":"Energy Industries (renewable/non-renewable sources)","methodology":"VMR0006","validationBody":"Carbon Check (India) Private Ltd.","province":null,"latitude":"19.856270","longitude":"102.495496","annualEstimate":373095,"creditingPeriod":{"start":"2022-05-04","end":"2032-05-03"},"creditsIssued":94224,"creditsRetired":8,"verificationPeriods":5,"lastVerification":"2025-03-31","projectLink":"https://registry.verra.org/app/projectDetail/VCS/2521","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":10,"name":"Installation of high efficiency wood burning cookstoves in Laos – Project 2","registry":"Verra","registryProjectId":"4314","program":"VCS","developer":"C-Quest Capital SGT Asia Stoves Private Limited","status":"Listed","statusDate":"2023-06-24","sector":"Energy Demand","projectType":"Energy Demand","methodology":"VMR0006","validationBody":"Carbon Check (India) Private Ltd.","province":null,"latitude":"19.856270","longitude":"102.495496","annualEstimate":1223363,"creditingPeriod":{"start":"2024-02-17","end":"2034-02-16"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/4314","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":55,"name":"Khammouan REDD Project","registry":"Verra","registryProjectId":"5463","program":"Verified Carbon Standard · VCS Version 3","developer":"Laos Global Carbon Technology Co.,LTD","status":"Under development","statusDate":"2025-02-25","sector":"Agriculture Forestry and Other Land Use","projectType":null,"methodology":"VM0007","validationBody":null,"province":"Khammouane","latitude":"17.500000","longitude":"105.333333","annualEstimate":240965,"creditingPeriod":{"start":"2022-03-01","end":"2042-02-28"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5463","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":54,"name":"Louang Namtha Afforestation Project","registry":"Verra","registryProjectId":"5462","program":"Verified Carbon Standard · VCS Version 3","developer":"Laos Global Carbon Technology Co.,LTD","status":"Under development","statusDate":"2025-02-25","sector":"Agriculture Forestry and Other Land Use","projectType":null,"methodology":"VM0047","validationBody":null,"province":"Luang Namtha","latitude":"20.956944","longitude":"101.395000","annualEstimate":274380,"creditingPeriod":{"start":"2022-03-01","end":"2052-02-29"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5462","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":53,"name":"Louang Namtha IFM (conversion of logged to protected forest) Project","registry":"Verra","registryProjectId":"5461","program":"Verified Carbon Standard · VCS Version 3","developer":"Laos Global Carbon Technology Co.,LTD","status":"Under development","statusDate":"2025-02-25","sector":"Agriculture Forestry and Other Land Use","projectType":null,"methodology":"VM0010","validationBody":null,"province":"Luang Namtha","latitude":"20.956944","longitude":"101.395000","annualEstimate":276496,"creditingPeriod":{"start":"2023-08-01","end":"2053-07-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5461","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":56,"name":"Methane emissions reduction through feed supplement for ruminant animals in Laos by AgCoTech","registry":"Verra","registryProjectId":"5611","program":"Verified Carbon Standard · VCS Version 3","developer":"AgCoTech Holdings Pty Ltd","status":"Under development","statusDate":"2025-06-09","sector":"Livestock, enteric fermentation, and manure management","projectType":null,"methodology":"VM0041","validationBody":null,"province":null,"latitude":"19.893300","longitude":"102.152500","annualEstimate":208143,"creditingPeriod":{"start":"2026-01-01","end":"2032-12-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5611","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":34,"name":"Mitigation of GHG: Rubber based agro-forestry system for sustainable development and poverty reduction in Pakkading, Bolikhamsay Province, Lao PDR","registry":"Verra","registryProjectId":"1684","program":"VCS","developer":"Lao Thai Hua Rubber Co. Ltd","status":"Listed","statusDate":"2024-12-02","sector":"Agriculture; forestry and fishing","projectType":"Agriculture Forestry and Other Land Use","methodology":"AR-ACM0003","validationBody":"RINA Services S.p.A","province":null,"latitude":"18.117606","longitude":"104.309478","annualEstimate":42497,"creditingPeriod":{"start":"2008-07-08","end":"2038-07-07"},"creditsIssued":106092,"creditsRetired":67065,"verificationPeriods":6,"lastVerification":"2022-07-04","projectLink":"https://registry.verra.org/app/projectDetail/VCS/1684","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":33,"name":"Nam Houng - 1 Hydro Power Project","registry":"Verra","registryProjectId":"4588","program":"VCS","developer":"Kosher Climate India Pvt. Ltd.","status":"Listed","statusDate":"2023-09-28","sector":"Energy Industries (renewable/non-renewable sources)","projectType":"Energy Industries (renewable/non-renewable sources)","methodology":"AMS-I.D.","validationBody":null,"province":null,"latitude":"19.188804","longitude":"101.804940","annualEstimate":40515,"creditingPeriod":{"start":"2023-09-01","end":"2030-08-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/4588","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":58,"name":"NAM KAIO HYDRO POWER PROJECT","registry":"Verra","registryProjectId":"5850","program":"Verified Carbon Standard · VCS Version 3","developer":"SINGAPORE TREASURE CARBON TECH PTE. LTD.","status":"Under development","statusDate":"2025-12-18","sector":"Energy industries (renewable/non-renewable sources)","projectType":null,"methodology":"AMS-I.D.","validationBody":null,"province":null,"latitude":"19.178750","longitude":"103.865692","annualEstimate":24080,"creditingPeriod":{"start":"2026-03-31","end":"2036-03-30"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5850","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":25,"name":"Nam Ngiep 2A Hydropower project","registry":"Verra","registryProjectId":"4934","program":"VCS","developer":"Kosher Climate India Pvt. Ltd.","status":"Listed","statusDate":"2001-01-01","sector":"Energy Industries (renewable/non-renewable sources)","projectType":"Energy Demand","methodology":"VCS-AMS-I.D.","validationBody":null,"province":"Xiengkhouang","latitude":"19.450000","longitude":"103.200000","annualEstimate":23751,"creditingPeriod":{"start":"2025-10-01","end":"2032-09-30"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/4934","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":109,"name":"Reducing Emissions from Deforestation and Carbon Enhancement in Xe Pian National Protected Area","registry":"Verra","registryProjectId":"1398","program":"VCS","developer":"Provincial Office of Agriculture and Forestry (PAFO)","status":"Registered","statusDate":"2001-01-01","sector":"Agriculture; forestry and fishing","projectType":"Agriculture Forestry and Other Land Use","methodology":"VM0015","validationBody":"TÜV SÜD South Asia Private Limited","province":null,"latitude":"14.385716","longitude":"106.153401","annualEstimate":64981,"creditingPeriod":{"start":"2014-09-01","end":"2044-08-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/1398","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":52,"name":"Savannakhet Town Afforestation Project","registry":"Verra","registryProjectId":"5460","program":"Verified Carbon Standard · VCS Version 3","developer":"Laos Global Carbon Technology Co.,LTD","status":"Under development","statusDate":"2025-02-25","sector":"Agriculture Forestry and Other Land Use","projectType":null,"methodology":"VM0047","validationBody":null,"province":"Savannakhet","latitude":"16.540000","longitude":"105.750000","annualEstimate":296030,"creditingPeriod":{"start":"2022-03-01","end":"2052-02-29"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5460","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":51,"name":"Savannakhet Town IFM (conversion of logged to protected forest) Project","registry":"Verra","registryProjectId":"5459","program":"Verified Carbon Standard · VCS Version 3","developer":"Laos Global Carbon Technology Co.,LTD","status":"Under development","statusDate":"2025-02-25","sector":"Agriculture Forestry and Other Land Use","projectType":null,"methodology":"VM0010","validationBody":null,"province":"Savannakhet","latitude":"16.540000","longitude":"105.750000","annualEstimate":280463,"creditingPeriod":{"start":"2023-08-01","end":"2053-07-31"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5459","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":11,"name":"SCALA LAOS AGROFORESTRY PROJECT 2","registry":"Verra","registryProjectId":"3787","program":"VCS","developer":"SilviCarbon Lao Sole Company Ltd.","status":"Listed","statusDate":"2023-04-16","sector":"Agriculture; forestry and fishing","projectType":"Agriculture Forestry and Other Land Use","methodology":"AR-ACM0003","validationBody":"Earthood Services Private Limited","province":null,"latitude":null,"longitude":null,"annualEstimate":null,"creditingPeriod":null,"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/3787","nationalRegistration":null,"source":"CAD Trust","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":31,"name":"Selabam Hydropower Extension Project","registry":"Verra","registryProjectId":"4684","program":"VCS","developer":"Kosher Climate India Pvt. Ltd.","status":"Listed","statusDate":"2023-11-07","sector":"Energy Industries (renewable/non-renewable sources)","projectType":"Energy Industries (renewable/non-renewable sources)","methodology":"AMS-I.D.","validationBody":null,"province":"Champasak","latitude":"14.880000","longitude":"105.870000","annualEstimate":8159,"creditingPeriod":{"start":"2022-12-14","end":"2029-12-13"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/4684","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":49,"name":"Small scale grouped hydropower project by Phongsubthavy Group Sole Co., Ltd","registry":"Verra","registryProjectId":"5423","program":"Verified Carbon Standard · VCS Version 3","developer":"Phongsubthavy Group Sole Co., Ltd","status":"Registration requested","statusDate":"2025-01-16","sector":"Energy industries (renewable/non-renewable sources)","projectType":null,"methodology":"AMS-I.D.","validationBody":null,"province":null,"latitude":"19.032390","longitude":"104.033360","annualEstimate":20615,"creditingPeriod":{"start":"2025-10-01","end":"2032-09-30"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5423","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":8,"name":"TTCA ORGANIC COMPOSTING PROJECT IN ATTAPEU","registry":"Verra","registryProjectId":"4667","program":"VCS","developer":"TTC Attapeu Sugar Cane Sole Co.","status":"Listed","statusDate":"2025-02-13","sector":"Livestock, enteric fermentation, and manure management","projectType":"Livestock, enteric fermentation, and manure management","methodology":"AMS-III.F.; AMS-III.D.","validationBody":"Carbon Check (India) Private Ltd.","province":"Attapeu","latitude":"14.800000","longitude":"106.830000","annualEstimate":47528,"creditingPeriod":{"start":"2022-07-01","end":"2032-06-30"},"creditsIssued":4375,"creditsRetired":0,"verificationPeriods":2,"lastVerification":"2023-06-30","projectLink":"https://registry.verra.org/app/projectDetail/VCS/4667","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"},{"id":57,"name":"VATTHANA Cassava Starch Plant Carbon Emission Reduction Project in Laos","registry":"Verra","registryProjectId":"5745","program":"Verified Carbon Standard · VCS Version 3","developer":"ICEBERG ENVIRONMENT PTE. LTD","status":"Under validation","statusDate":"2025-09-21","sector":"Energy industries (renewable/non-renewable sources); Waste handling and disposal","projectType":null,"methodology":"ACM0014","validationBody":null,"province":null,"latitude":"15.693000","longitude":"106.114000","annualEstimate":63488,"creditingPeriod":{"start":"2025-10-25","end":"2035-10-24"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/5745","nationalRegistration":null,"source":"Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-06-04T04:16:22.000Z"},{"id":5,"name":"XESET 2 EXTENTION HYDROPOWER PROJECT","registry":"Verra","registryProjectId":"3353","program":"VCS","developer":"B.B. Energy (Asia) Pte Ltd","status":"Listed","statusDate":"2022-09-07","sector":"Energy Industries (renewable/non-renewable sources)","projectType":"Energy Industries (renewable/non-renewable sources)","methodology":"AMS-I.D.","validationBody":"Earthood Services Private Limited","province":"Salavan","latitude":"15.720000","longitude":"106.420000","annualEstimate":19235,"creditingPeriod":{"start":"2023-02-21","end":"2030-02-20"},"creditsIssued":null,"creditsRetired":null,"verificationPeriods":0,"lastVerification":null,"projectLink":"https://registry.verra.org/app/projectDetail/VCS/3353","nationalRegistration":null,"source":"CAD Trust + Verra registry (snapshot 4 Jun 2026)","retrievedAt":"2026-11-21T17:35:28.115Z"}]}